Interim Support for a Global Manufacturer

Client Sector: Industrial Manufacturing

Services Delivered:
  • 6 month interim support  

Outcome:

  • BayNel were appointed on a short-term contract to provide support to the Director of Sustainability

  • Support services included- Gap Analysis of their GHG reporting, development of GHG inventory and drafting o guidance on issues such as renewable energy procurement and carbon offsetting. The work helped to improve the quality of data to enable a net zero strategy to be set.

Recent posts

Case Study: Double Materiality Assessment for a UK House-builder

Connected logistics icons on white balls connected by white lines

Case Study: Supporting organisations to better understand and reduce their Scope 3 emissions

lucy boreham with a green background

In an Age of ESG Backlash- does governance matter more than ever?